Ali
Well-known member
- Joined
- May 10, 2009
- Messages
- 289
- Reaction score
- 0
Hi all,
I've got my 2391 practical tomorrow and I am having a last minute look through my books. Am I right in saying I'll have to do a phase rotation test at the main board and also the 3 phase socket?
I think I'm alright with the rest of it all, just the time factor that worries me most.
Ali
I've got my 2391 practical tomorrow and I am having a last minute look through my books. Am I right in saying I'll have to do a phase rotation test at the main board and also the 3 phase socket?
I think I'm alright with the rest of it all, just the time factor that worries me most.
Ali