Ray4438
Well-known member
Connected a Mira sport shower today and when testing the earthing arrangements found out the following
Tns supply main earth connected to sheaf.
Ze was was between 4.8 and 5 ohms Do I have to contact the power company to get this updated
Tns supply main earth connected to sheaf.
Ze was was between 4.8 and 5 ohms Do I have to contact the power company to get this updated