Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Just thought I'd mention.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Barx" data-source="post: 201606" data-attributes="member: 121"><p>Well, yesterday we were setting up the smaller roof in front of the main building (all photies are from the main building) (part of same install, going to same supplies). It has 4 arrays (3 x 160 panels and a 170 panels), and so 4 3-phase invertors. 3 x 12.5 kw and a 15kw. We did the unistrut for these and hung them. The armoured that went from the pv panel of this section of the install to the sub was 35mm 4 core (we pulled that in yesterday too). Was a good long run to pull up over 10 meters high too. I would say this section equates to about a quater of the full install.</p></blockquote><p></p>
[QUOTE="Barx, post: 201606, member: 121"] Well, yesterday we were setting up the smaller roof in front of the main building (all photies are from the main building) (part of same install, going to same supplies). It has 4 arrays (3 x 160 panels and a 170 panels), and so 4 3-phase invertors. 3 x 12.5 kw and a 15kw. We did the unistrut for these and hung them. The armoured that went from the pv panel of this section of the install to the sub was 35mm 4 core (we pulled that in yesterday too). Was a good long run to pull up over 10 meters high too. I would say this section equates to about a quater of the full install. [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
Just thought I'd mention.
Top