SAFE INSOLLATION PROCEDURE
barrier tape area
select voltage indicator
verify voltage indicator with proven unit
turn off isolator
lock off insulator
keep key
test incoming tails
line - Neutral, Earth-Line, Earth- Neutral
verify voltage indicator with proven unit
VISUAL INSPECTION
check DB visual
check lighting circuit visual
take lamp holder cover off
check ring circuit visual
remove one socket cover
check motor circuit visual
remove starter cover
check commando socket visual
check RCD visual
remove Garage DB cover
check light circuit visual
check single socket visual
check Shower circuit
take cover off shower
check main bonding earth
check supplementary bonding - shake it baby
DEAD TESTS
CPC CONTINUITY TEST
select low resistance ohms meter
select 20 ohms
select auto null
auto null the tester
put temporary link into ET
remove line from circuit breaker situated on the left
put line into temporary link with ET
go to farer point of that circuit (lamp holder)
test between earth terminal and switching conductor
put value in R1 + R2 on test sheet
test switch is working and tick polarity on test sheet
remove temporary link and go to next circuit
take line of the next circuit and connect it to temporary link
go to farer point of that circuit
measure between earth and functional line conductor
record the result
test switch and tick polarity
remove link and go to next circuit (commando socket)
put 16A plug into commando socket
test at connector block earth-line
operate switch and put R1+R2 result and tick polarity
go to motor circuit
put line into temporary link with ET
measure between earth and line conductor
operate switch and put R1+R2 result and tick polarity
replace line back into circuit breaker
go to next circuit (garage RCD)
carry on R2 test only - test between ET's (don
barrier tape area
select voltage indicator
verify voltage indicator with proven unit
turn off isolator
lock off insulator
keep key
test incoming tails
line - Neutral, Earth-Line, Earth- Neutral
verify voltage indicator with proven unit
VISUAL INSPECTION
check DB visual
check lighting circuit visual
take lamp holder cover off
check ring circuit visual
remove one socket cover
check motor circuit visual
remove starter cover
check commando socket visual
check RCD visual
remove Garage DB cover
check light circuit visual
check single socket visual
check Shower circuit
take cover off shower
check main bonding earth
check supplementary bonding - shake it baby
DEAD TESTS
CPC CONTINUITY TEST
select low resistance ohms meter
select 20 ohms
select auto null
auto null the tester
put temporary link into ET
remove line from circuit breaker situated on the left
put line into temporary link with ET
go to farer point of that circuit (lamp holder)
test between earth terminal and switching conductor
put value in R1 + R2 on test sheet
test switch is working and tick polarity on test sheet
remove temporary link and go to next circuit
take line of the next circuit and connect it to temporary link
go to farer point of that circuit
measure between earth and functional line conductor
record the result
test switch and tick polarity
remove link and go to next circuit (commando socket)
put 16A plug into commando socket
test at connector block earth-line
operate switch and put R1+R2 result and tick polarity
go to motor circuit
put line into temporary link with ET
measure between earth and line conductor
operate switch and put R1+R2 result and tick polarity
replace line back into circuit breaker
go to next circuit (garage RCD)
carry on R2 test only - test between ET's (don