Robin Spark
Well-known member
- Joined
- Aug 30, 2009
- Messages
- 1,425
- Reaction score
- 0
I installed a 6mm 3 core SWA (20 metres) to shed a few years ago, TNS supply and normal 2 way garage CU with RCD main switch. There are just a few sockets and couple of bulkhead lights as the shed is just used as an office.
The customer has told me she is going to have a water supply installed for a sink.
Just need to double check that no main bond will need to be run if suppy and waste is all done in PVC.
The customer has told me she is going to have a water supply installed for a sink.
Just need to double check that no main bond will need to be run if suppy and waste is all done in PVC.