Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Max PV system size for UK FITS
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="kme" data-source="post: 180565" data-attributes="member: 113"><p>G59 (not GN - it isn`t a guidance note mate) - is the DNO spec. for EG`s &gt;16A/phase( Embedded Generators) ; but it IS the relevant document, as far as DNO connection goes.</p><p></p><p>You`d have to liase with DNO to see what their network can handle in that area ( remember than, for the most part, the network was never envisaged as having multiple local sources feeding <em> into</em> it!)</p><p></p><p>IF the DNO are happy, you can go over the 16A/phase limit, with the correct planning application.</p><p></p><p>I have a contact (AND the installer qual <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite2" alt=";)" title="Wink ;)" loading="lazy" data-shortname=";)" /> )</p><p></p><p>KME</p></blockquote><p></p>
[QUOTE="kme, post: 180565, member: 113"] G59 (not GN - it isn`t a guidance note mate) - is the DNO spec. for EG`s >16A/phase( Embedded Generators) ; but it IS the relevant document, as far as DNO connection goes. You`d have to liase with DNO to see what their network can handle in that area ( remember than, for the most part, the network was never envisaged as having multiple local sources feeding [I] into[/I] it!) IF the DNO are happy, you can go over the 16A/phase limit, with the correct planning application. I have a contact (AND the installer qual ;) ) KME [/QUOTE]