Ok guys, here goes.
Just had some plans through for a 2 story new build so please excuse me if I bombard you all with a few questions.
Just one for now. Electrical notes state :
" Form main service cable entry below ground to terminate under the main fuseboard situated in the utility room. The meter is to be sited in an external cabinet."
I take it this short run will have to be 25mm SWA, and if so, do I use 3 core' or 2 core and run the earth seperately. Always done seperate tails up until now.
Cheers
Bez
Just had some plans through for a 2 story new build so please excuse me if I bombard you all with a few questions.
Just one for now. Electrical notes state :
" Form main service cable entry below ground to terminate under the main fuseboard situated in the utility room. The meter is to be sited in an external cabinet."
I take it this short run will have to be 25mm SWA, and if so, do I use 3 core' or 2 core and run the earth seperately. Always done seperate tails up until now.
Cheers
Bez