Electrical theory question here, please don't be to brutal if the answer is obvious...
Came across an install today with two supplies connected before the CU via henley blocks, one supply was mains and the other was the PV install.
My first question is this: how does the CU know to use the solar supply first and then the mains grid second?
Second question is: assuming it can't prioritise, when using both supplies simultaneously how does the current flow into the install? Is it 50/50 from each supply or is there a method to calculate the flow.
Not really important to me directly as PV installs are not my line of work, I am simply interested in how it works.
Thanks all in advance
Came across an install today with two supplies connected before the CU via henley blocks, one supply was mains and the other was the PV install.
My first question is this: how does the CU know to use the solar supply first and then the mains grid second?
Second question is: assuming it can't prioritise, when using both supplies simultaneously how does the current flow into the install? Is it 50/50 from each supply or is there a method to calculate the flow.
Not really important to me directly as PV installs are not my line of work, I am simply interested in how it works.
Thanks all in advance