Ok, I have spent a week installing a fire alarm system into a commercial property, at the start of the job I offered surface mount, or in conduit, the client being smart and wanting to keep the costs down said surface would be fine.
However now that the bright red cables are installed he said he would like it in conduit, fine I say, but it will have to be red, and will finish at least 4 inch from all surface mounted items because they will not fit, or I can replace the whole lot with metal trunking, and leave the manual call pints as they are. His mate? said I was talking a load of rubbish and that the conduit can be plastic and does not need to be red.
Now I know my reasons for saying the trunking had to be red, but can any of you guess why I insisted on red trunking? Or if not metal?
However now that the bright red cables are installed he said he would like it in conduit, fine I say, but it will have to be red, and will finish at least 4 inch from all surface mounted items because they will not fit, or I can replace the whole lot with metal trunking, and leave the manual call pints as they are. His mate? said I was talking a load of rubbish and that the conduit can be plastic and does not need to be red.
Now I know my reasons for saying the trunking had to be red, but can any of you guess why I insisted on red trunking? Or if not metal?