Maybe it was double insulated,? :CThat was lucky that the DNO rocked up and fitted the REC2 :innocent
anyway, curve boards....I have fitted a fair few of these when the client won't lash out on a DP @SBS Dave board
RCBO to,every cct with possible exception of Alarm and garage main subject to,the usual
anyway...fitted one last week and there was NO connection between the metal case and the Earth bar
just saying
That was lucky that the DNO rocked up and fitted the REC2 :innocent
Maybe it was double insulated,? :C
Lots of metal light fittings are,,,,,,
They've fitted the cover upside down,
They normally put the small section on the outgoing terminals,I haven'tthey haven't have they ? Lucky they were working next door , moved the meter , fitted the isolator , resealed .
Kerch ...I'll check the next one for earth continuity, what is it , the paint ? I have one in the Evans Electric Warehousing Facility , I'll check it .
Another board change today , same make , Curve , so I checked the continuity between earth bar and box . Only using the Steinel but could'nt get continuity between earth bar and any of the screws , din rail & front cover . Continuity was there between earth bar & the earth stud though. Theres a screw at the end of the earth bar into the frame I see.I haven'tthey haven't have they ? Lucky they were working next door , moved the meter , fitted the isolator , resealed .
Kerch ...I'll check the next one for earth continuity, what is it , the paint ? I have one in the Evans Electric Warehousing Facility , I'll check it .
Well there has been on every other one I have fitted......except the last one!Theres a screw at the end of the earth bar into the frame I see.
Enter your email address to join: