Lillpete
Senior Member
- Joined
- Jan 18, 2009
- Messages
- 214
- Reaction score
- 0
I know you shouldn't export the earth with PME to a shed and always bang in a rod or two to run a CCU in the garden building.
But I am currently quoting to install 2 outdoor sockets (MK Masterseal) either side of some new decking I will be running this from a fused connection unit (redundant as it used to feed a shed)
it will obviously all be rcd'd but what about the exported earth I presume you wouldn't bang in a rod for each socket and I wouldn't have thought you would install a new consumer unit spurred of a ring?? because of the layout it is not feasible to run in a new supply to an IP rated ccu.
Any advice??
But I am currently quoting to install 2 outdoor sockets (MK Masterseal) either side of some new decking I will be running this from a fused connection unit (redundant as it used to feed a shed)
it will obviously all be rcd'd but what about the exported earth I presume you wouldn't bang in a rod for each socket and I wouldn't have thought you would install a new consumer unit spurred of a ring?? because of the layout it is not feasible to run in a new supply to an IP rated ccu.
Any advice??