Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrical Inspection & Testing Forum
Some pics from that hotel PIR
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="kme" data-source="post: 132782" data-attributes="member: 113"><p>Currently? I have about 270 items on the fault list.....</p><p></p><p>e.g. when the accomodation floors were redone, they dropped a TPN board in the riser, off the 400A busbars (single phase, barred out). Then used BS88 40A fuses, and 6mm SWA to sub-boards in the local risers, feeding 1 or 2 rooms with light / power.</p><p></p><p>This was the way the local boards had been installed on one whole floor (20 boards affected):</p><p></p><p><img src="http://i316.photobucket.com/albums/mm323/kmelectric/ramada%20picadilly%202010/12thlocalDBa.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>The main DB to the floor:</p><p></p><p><img src="http://i316.photobucket.com/albums/mm323/kmelectric/ramada%20picadilly%202010/DB12-1.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Connection of a wall light to 1 of the rooms:</p><p></p><p><img src="http://i316.photobucket.com/albums/mm323/kmelectric/ramada%20picadilly%202010/14thwalllight.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>KME</p></blockquote><p></p>
[QUOTE="kme, post: 132782, member: 113"] Currently? I have about 270 items on the fault list..... e.g. when the accomodation floors were redone, they dropped a TPN board in the riser, off the 400A busbars (single phase, barred out). Then used BS88 40A fuses, and 6mm SWA to sub-boards in the local risers, feeding 1 or 2 rooms with light / power. This was the way the local boards had been installed on one whole floor (20 boards affected): [IMG]http://i316.photobucket.com/albums/mm323/kmelectric/ramada%20picadilly%202010/12thlocalDBa.jpg[/IMG] The main DB to the floor: [IMG]http://i316.photobucket.com/albums/mm323/kmelectric/ramada%20picadilly%202010/DB12-1.jpg[/IMG] Connection of a wall light to 1 of the rooms: [IMG]http://i316.photobucket.com/albums/mm323/kmelectric/ramada%20picadilly%202010/14thwalllight.jpg[/IMG] KME [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrical Inspection & Testing Forum
Some pics from that hotel PIR
Top