Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrical Inspection & Testing Forum
Some pics from that hotel PIR
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="kme" data-source="post: 132900" data-attributes="member: 113"><p>S`funny mate - I really; REALLY didn`t!!!!!</p><p></p><p>(quite a few of those; "supposed" to be redundant <em>post-refit</em> - NOT!)</p><p></p><p>Also; found out on the last day - if you go out on the roof, and look left behind two of the aircon fans; there`s a 2`6" X 3` metal vent cover on the wall. IF you remove this vent cover, put a torch in your gob and crawl into this hole approx 5` - they`re TWO dist boards.</p><p></p><p>They don`t appear on MY schedules; and I wouldn`t test in there anyway - H&amp;S risks. SO we ignored that; and I`ll make a note on the paperwork.</p><p></p><p>I`ll post piccies of one of the risers later - opened the door, took one look and closed the door again - totally unsafe.</p><p></p><p>N.B. I don`t WANT the remedials android. The hotel has asked if we`ll "re-inspect" after they`ve been done - I have no issue with that. But carring out some of the remedials? A 25mm SWA installed on a circuit, for which the spec. on the EIC is 120mm, for instance?</p><p></p><p>There`s already been a fire caused by this works - I don`t want any of that with my signature near it.......</p><p></p><p>KME</p></blockquote><p></p>
[QUOTE="kme, post: 132900, member: 113"] S`funny mate - I really; REALLY didn`t!!!!! (quite a few of those; "supposed" to be redundant [I]post-refit[/I] - NOT!) Also; found out on the last day - if you go out on the roof, and look left behind two of the aircon fans; there`s a 2`6" X 3` metal vent cover on the wall. IF you remove this vent cover, put a torch in your gob and crawl into this hole approx 5` - they`re TWO dist boards. They don`t appear on MY schedules; and I wouldn`t test in there anyway - H&S risks. SO we ignored that; and I`ll make a note on the paperwork. I`ll post piccies of one of the risers later - opened the door, took one look and closed the door again - totally unsafe. N.B. I don`t WANT the remedials android. The hotel has asked if we`ll "re-inspect" after they`ve been done - I have no issue with that. But carring out some of the remedials? A 25mm SWA installed on a circuit, for which the spec. on the EIC is 120mm, for instance? There`s already been a fire caused by this works - I don`t want any of that with my signature near it....... KME [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrical Inspection & Testing Forum
Some pics from that hotel PIR
Top