whats the minimum u expect in a house or be paid to install befor u work

eg customer wants 1 socket so u requier

main bonding (correct csa) (supplimentry if applicable)

rcd on circuit to be worked on or installed from were u work from

circuit must be safe to work on,

correct breaking capacity of mcb/fuse

 
i always look at the job, and then send quote through the post as some cable routes can be a nightmare others very easy. i always look at main bonding and rcd/consumer unit and let them know if its not up to standard then take it from there.

 