sellers Well-known member Joined Feb 2, 2009 Messages 2,582 Reaction score -2 Mar 11, 2010 #1 what do you think folks, needs an upgrade? isn't it asbestos within the carrier?
Blue Duck Tonys Hero™ Supporting Member Joined Feb 10, 2010 Messages 6,987 Reaction score 119 Location Where the wild things are Mar 11, 2010 #2 mmm 70's... mmm asbestos... I rekon Its due for a change!? though it does look pretty sound.
gselectrical Well-known member Joined Oct 13, 2009 Messages 627 Reaction score 0 Mar 11, 2010 #3 Meter looks fairly recent. Surely they'd have noted the fact that the head needs upgrading at the time of installing the meter? Asbestos? Fused neutral? J
Meter looks fairly recent. Surely they'd have noted the fact that the head needs upgrading at the time of installing the meter? Asbestos? Fused neutral? J
sellers Well-known member Joined Feb 2, 2009 Messages 2,582 Reaction score -2 Mar 11, 2010 #4 meter says norweb on it so must be at least 10years old at a guess. The head is in average condition, neutral is a solid link. I've never come accross a re-wireable cut out before.
meter says norweb on it so must be at least 10years old at a guess. The head is in average condition, neutral is a solid link. I've never come accross a re-wireable cut out before.
Lurch Distinguished Member Joined Nov 28, 2009 Messages 5,388 Reaction score 12 Location S. Yorks. Mar 11, 2010 #5 Neutral link has been sorted so it's fine.
sparkss DNO Jointer Joined Mar 24, 2008 Messages 143 Reaction score 0 Mar 11, 2010 #6 now if the door was to say... fall off it would be a new cut out asap