Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Which application form needed with Western Power and battery storage.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="carptench" data-source="post: 524938" data-attributes="member: 34841"><p>Looking to install a 12kw Solar array with approximately 13.kwh of battery storage. (Probably Plylontech)</p><p>Had a few MCS companies quote for the installation and the prices quoted are too much. I can buy the same equipment and have it installed by a NEIC contractor for half the price. But obviously I will loose the potential SEG payments.</p><p></p><p>Does anyone know which application form needs to used for a system of this size? The G99 A1-2 doesn't fit with this (<strong>Power Generating Module</strong>s (including <strong>Electricity Storage</strong> devices) is between 16 A and 32 A per phase<img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite2" alt=";)" title="Wink ;)" loading="lazy" data-shortname=";)" /> </p><p>Form G99 A1-1 allows for 17kw single phase but doesn't mention battery storage??</p><p>The only other options seems to be the standard G99. Which is a 50 page application and doesn't seem right either as all the pre-filled data refers to MW not KW.</p><p></p><p>I am also confused why having battery storage would need to be included on a application. When any stored energy from the the solar would be used in our property not fed back into the grid. If anyone could educate me on this it would be much appreciated.</p><p></p><p>Thanks</p><p>M</p></blockquote><p></p>
[QUOTE="carptench, post: 524938, member: 34841"] Looking to install a 12kw Solar array with approximately 13.kwh of battery storage. (Probably Plylontech) Had a few MCS companies quote for the installation and the prices quoted are too much. I can buy the same equipment and have it installed by a NEIC contractor for half the price. But obviously I will loose the potential SEG payments. Does anyone know which application form needs to used for a system of this size? The G99 A1-2 doesn't fit with this ([B]Power Generating Module[/B]s (including [B]Electricity Storage[/B] devices) is between 16 A and 32 A per phase;) Form G99 A1-1 allows for 17kw single phase but doesn't mention battery storage?? The only other options seems to be the standard G99. Which is a 50 page application and doesn't seem right either as all the pre-filled data refers to MW not KW. I am also confused why having battery storage would need to be included on a application. When any stored energy from the the solar would be used in our property not fed back into the grid. If anyone could educate me on this it would be much appreciated. Thanks M [/QUOTE]