Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. S

    Isolation switches

    I understand nothing in bs7671 says must have , but as these are new vent axia fans and the customer doesn’t understand that due to manufacturers instructions saying they must be fitted to a 3 pole isolation switch , that if they are removed then the warranty will be void if in the event of a...
  2. S

    Isolation switches

    The isolation switch question . Recently changed a fusebaord for a customer just because they wanted rcbos and done some other minor works , now customer is asking me to remove and blank off 3 extractor fan isolation switches that were allready installed (house is going to be a hmo ) ...
  3. S

    Stolen

    Yeah I know to be honest was a long days work and with a van vault safe it was all locked away with power tools , but they cut it open and stole the lot , learnt my lesson now
  4. S

    Stolen

    Thanks I’ve got some names being thrown around local area so time will tell, a few broken fingers will make sure they won’t be in a hurry to do it again
  5. S

    Stolen

    Yeah I’m keeping an eye on on gumtree , eBay etc ,
  6. S

    Stolen

    Had my van broken into , the robbing b*****ds have stolen all power tools, cable, electrical tester etc . Is there a site for reporting stolen electrical testers as they have serial numbers? I’ve called round local electrical wholesalers as it’s due calibration next month so have given serial...
  7. S

    Napit online?

    does anyone use Napit online? I’ve been trying to submit a building control notification this afternoon using my Napit online , usually straight forward , however when I click the works bar it says no data so doesn’t display the notifiable works list like normal just wondered if anyone else’s...
  8. S

    Cable gland? 3 phase 50mm meter tails

    Yes this is what I’m saying they are saying they can’t get them , which is why I’m asking as someone surely used a supplier before on here that I could ask for
  9. S

    Cable gland? 3 phase 50mm meter tails

    As long as can be through a single entry point going into galvanised box trunking they didn’t specify just single entry - which I normally do with 25mm tails but this is a larger supply so 50mm tails . Will try a 70 but don’t think all cables will fit through together still
  10. S

    Cable gland? 3 phase 50mm meter tails

    I have in Gloucester where I’m based and all say they don’t do any to take 50mm meter tails together hence why asking here again
  11. S

    Cable gland? 3 phase 50mm meter tails

    Would anyone know where I can purchase a gland big enough? This needs to be for all 3 phases and neutral? Normally deal with 25mm tails . However the meter company are requesting 50mm meter tails and I can’t find a gland big enough for all them to go through together .
  12. S

    Cable gland? 3 phase 50mm meter tails

    Thanks everyone for the replies
  13. S

    Cable gland? 3 phase 50mm meter tails

    No I’m not suggesting anything of the kind
  14. S

    Cable gland? 3 phase 50mm meter tails

    Hi guys , wonder if you can help , I am completing an electrical installation shortly and meter installer is requesting all 3 phase meter tails to enter galv box trunking through 1 single gland . However I have 3 phase board with 50mm meter tails and can’t seem to find a gland/ or brass gland...
  15. S

    Advice needed

    The plastic pipe is a hep pipe running cold water supply to a hand wash basin . not sure if air con pipes have been lagged I’m hoping to get access to the unit this week to have a look as have a couple of connections to make and then customer wants the installation certificate 
  16. S

    Advice needed

    Good afternoon all, just a couple of quick questions I’m hoping someone can help me out with 1. can air conditioning pipes be installed in a cable tray that is used for electrical circuits? I have installed a cable tray system and installed electrics and air con company have come in and...
  17. S

    Help required

    Had it confirmed today it’s 110kva so I make that 159amp per phase then so 70mm tails as enclosed in a small section if 100 x 100 trunking . still waiting on energy company getting back to me but building designer has requested capable of 110kva 
  18. S

    Help required

    Yes I agree building services designer has been on today and stated that the electric supply company want tails installed out of cut out ready for meter to be fitted and must be suitable for 110kva  - this is what he has been passed on by energy company to my customer 
  19. S

    Help required

     All I’ve been asked to do is to supply and install tails into the service head - and for these to be terminated before meter installation date - that’s the exact details I’ve got from customer 
  20. S

    Help required

    Thank you for this 
Top