Hi all so I generally carry out domestic works and small commercial works and now I’m going for my assessment for commercial works 3phase with NICEIC .
now I have found a small new job which I can use for my assessment but need to make sure I get everything spot on .
so I’m ok with all circuit cables etc but here’s something I haven’t yet had to do before .
unit has a 3 phase supply coming into it and electric supply com Sony has requested meter tails be installed from supply to meter location prior to there visit and also meter tails from meter location to distribution board .
now developers of the new site have stated 125kva minimum ,
but having only done domestic 25mm before I’m not sure what size meter tails to come from supply side to meter and from meter to distribution Board based on 125kva , as stated this is 3 phase retail shop .
Can someone help?
now I have found a small new job which I can use for my assessment but need to make sure I get everything spot on .
so I’m ok with all circuit cables etc but here’s something I haven’t yet had to do before .
unit has a 3 phase supply coming into it and electric supply com Sony has requested meter tails be installed from supply to meter location prior to there visit and also meter tails from meter location to distribution board .
now developers of the new site have stated 125kva minimum ,
but having only done domestic 25mm before I’m not sure what size meter tails to come from supply side to meter and from meter to distribution Board based on 125kva , as stated this is 3 phase retail shop .
Can someone help?