  1. M

    your fired!!!!

    Spreads=plasterers Well done Gavin.
  2. M

    quick question

    I find grey makes the best N because the CPC is in between that and the other 2 cores. Much like a CPC divides the cores in a T&E. Just my personal pref.
  3. M

    Bonding to gas and water block of flats

    As much as I agree with how ADS is interpreting the regs, I think the regs implies in 132.16 that an existing installation starts at the distributors equipment. BUT it's all up for interpretation... However... If an installation starts at the Distributors equipment, then Gas and Water bonding...
  4. M

    Bonding to gas and water block of flats

    Hi ADS, Just to let you know that in the second circumstance. The reading is a Zdb not a Ze. I've been corrected.
  5. M

    Bonding to gas and water block of flats

    My apologies. I stand corrected.
  6. M

    Bonding to gas and water block of flats

    I'll go over it again for you so you understand what happened because from what you are posting, you've obviously missed something or assumed something. A large Victorian town house has one supply. The house had been converted into flats. I took a Ze in the flat we were working in (by saying...
  7. M

    Bonding to gas and water block of flats

    Of course I didn't!!! You playing the incompetent card AGAIN!!! Please remove the tone from you writing and the chip on your shoulder!! Sick of hearing it from you.. Such a shame for such a knowledgable. My boss called supplier to sort earth as PME was available.
  8. M

    Bonding to gas and water block of flats

    It went back to the MET next to the supply, along with the earths of the other flats. This MET was disconnected from the earth spike.
  9. M

    Bonding to gas and water block of flats

    I asked that exact question once.. It didn't go anywhere... It was cut off from the earth spike when the house was renovated 10 yrs previous.. The readings I was getting was the other flat's water and gas connections..
  10. M

    Bonding to gas and water block of flats

    Possibly the second one!! Else how do I know I'm getting Earth and not someone else's gas bonding as a reading?
  11. M

    Bonding to gas and water block of flats

    Ze? With muli flats bonding incoming supplies.. Does that mean your gonna need to knock on all doors to disconnect everyone's bonding to get a Ze?
  12. M

    MEGGER 1720

    John.. Re read our above posts
  13. M

    MEGGER 1720

    Same with mine.. Going back Monday, be interesting to see the changes.
  14. M

    High Zs

    The 2 tests I did were on the MET in the DB and the Line on the main switch.. No RCD's.. 2 different readings. Also the earlier test were carried out with plug lead so no probs with holding leads.. (not so) megger going back. Still a nice bit of kit if it worked. Also miffed the calibration a...
  15. M

    2 way Light tripping MCB

    Don't say that, mine's going back to them on Monday!
  16. M

    High Zs

    My 1730 going back to them. My high current took a reading of .30 and the No-Trip took same test and read 1.10!!
  17. M

    MEGGER 1720

    My 1730 going back to them. My high current took a reading of .30 and the No-Trip took same test and read 1.10!!
  18. M

    An awkward situation

    Might be worth meeting with A N Other sparks at workshop for hand over prior to holiday to mitigate spray in face. Tell builder that's what you want otherwise no comeback.
  19. M

    Meter Tail installation that exceed 3 meters length passing through the building fabric?

    What's wrong with running them under or in the floor? Then up to the board clipped? Nought wrong with a bit of grinding or chasing to cheer up the builder!! http://www.cavitytrays.co.uk/associated-items/view/5/111/1/type-i-in-screed-services-duct
  20. M

    Advice wanted re new boiler and shower please

    So after all that.. Get your boiler sorted first, then look at the options of either an electric shower fed off cold feed only, or shower valve fed from hot and cold supply (preferably thermostatic valve). If you pay out for a pump now, could be a complete waste of money when boiler upgraded to...