I am doing my own build and doing the wiring which will be checked by a contractor appointed by building control. Whilst doing the first fix all cables and JB's are being numbered and checked for continuity and insulation as per good practice, and marked on drawings for my own use and also to make it easier for the checking contactor. What I want to know is how far to take the first fix i.e. how much can I do within this first fix. Traditionally to me this is known as pre plasterboard checks and it was to check that cables were correct rating grommets in boxes securely fixed etc. The nature of what I am doing means that there will be some plasterboard in place. Building control do not have a checklist but have indicated that if it is obvious where the cable goes then that would be acceptable. Does anyone have a list I can work to as I cant find one on net.?
Any pointers welcome.
Thanks