tcfreeman08
Member
- Joined
- Sep 24, 2009
- Messages
- 30
- Reaction score
- 0
Hi all,
Q. On a construction site a final circuit exceeding 32A and supplied by a TT system shall have a disconnection time not exceeding
a.0.2s
b.0.3
c.0.8
d.1.0sec
the ans is d, but, I found from P.46 table 41.1 and P.181
the time is 0.3sec, why 1.0sec??
please help.
Q. On a construction site a final circuit exceeding 32A and supplied by a TT system shall have a disconnection time not exceeding
a.0.2s
b.0.3
c.0.8
d.1.0sec
the ans is d, but, I found from P.46 table 41.1 and P.181
the time is 0.3sec, why 1.0sec??
please help.