on a electrical cert a classic example is a fuseboard change, I was just wondering if say you wanted 2 extra sockets on an existing ring and you had to install extra new cable to make it a ring again is this the same thing it would go down as an alteration to an installation?

 
Minor work's for me too. But iv'e not wrote a cert in ages, my polish mate write's them for me as he goes into more detail :coat

 
im confused OP, are you saying if you done a fuseboard change and added a couple of socket would you use the alteration box?

Or are you asking what form to use?  We seem to have a mix of answers above. 

 
Im just saying a fuseboard change would go down as an alteration on an electric cert.I didnt mean just change 2 existing socket fronts for new fronts which would be a minor works.I ment altering the existing ring for 2 new socket fronts i.e splitting the ring under the floor joint box and making it a ring with new cables to your new 2 sockets this would be alteration surely of a circuit?thats my call anyway

 
+1 prodave. That wouldn't warrant any paperwork but cutting into ring for additional sockets is a minor works not an eic. Eic is for new circuits or change of cpd :)

 
Have to agree with Dave and Matty

Replacement CU - alteration on EIC

New circuit - addition on EIC

Altering or adding to an existing single circuit - MWC

Altering or adding to several existing circuits - alteration on EIC (or MWC for each circuit)

 
Just read the posts on this;

I am not sure if I have a crossed wire on this one;

OSG states; replacement of consumer

unit or distribution board, needs an EICR.   Page 151.

When the OSG says replacement, I read that as re-positioning

and not just new kit.  Replacement could mean renewal.

I do not read "alteration on EICR" as matching what OSG says.

Not nit-picking, just observing.

 
Good point Sharp;  yes, the EIC for the work. i.e.

replacement.  I should have said EIC, I said EICR.

Page 152;  the EICR is used after periodic has been

carried out.

If you look at it in the round, as it were, the board

change or replacement is a change of characteristics,

as you said.

 
installation cert for a mains change and minor works for the extra sockets as you're altering the ring circuit. not installing a new one

 