The bonding from the MET is run externally, 10mm cable clipped to the brickwork all the way to the gas meter (about 12 meters).
Should this cable at least be ran in conduit or upgraded to 16mm?.
Would it be down to me to get this rectified?
Thanks
Should this cable at least be ran in conduit or upgraded to 16mm?.
Would it be down to me to get this rectified?
Thanks