State the condition for the effective termination of cables in terms of
a) being electrically and mechanically sound
b) ability to carry out design current
c) prevention of corrosion
Where an RCD (residential current device) is used as supplementary protection against direct contact, state the
a) operating current requirements
b)operating time
c)two times for an R.C.D BS EN 60010
d) type of test lamp will not operate RCD's when used to probe between phases and earth
State the purpose of the inspection, testing and commissioning of a new electrical installation in terms of
a) compliance with BS7671
b) meeting specification
c)being safe to use
List six sources of information that will be required for the inspection and testing of a completed electrical installation
Describe how to carry out the following test of an electrical installation
a) continuity of final ring circuits
b)insulation resistance
c) earth fault loop impedance
When carrying out inspection and testing and test procedures on a completed electrical installation
a) describe why it is necessary to carry out continuity test before insulation resistance
b)state the precautions to be taken when conducting insulation resistance tests
state the safety measures when carrying out earth fault loop impedance tests
a) being electrically and mechanically sound
b) ability to carry out design current
c) prevention of corrosion
Where an RCD (residential current device) is used as supplementary protection against direct contact, state the
a) operating current requirements
b)operating time
c)two times for an R.C.D BS EN 60010
d) type of test lamp will not operate RCD's when used to probe between phases and earth
State the purpose of the inspection, testing and commissioning of a new electrical installation in terms of
a) compliance with BS7671
b) meeting specification
c)being safe to use
List six sources of information that will be required for the inspection and testing of a completed electrical installation
Describe how to carry out the following test of an electrical installation
a) continuity of final ring circuits
b)insulation resistance
c) earth fault loop impedance
When carrying out inspection and testing and test procedures on a completed electrical installation
a) describe why it is necessary to carry out continuity test before insulation resistance
b)state the precautions to be taken when conducting insulation resistance tests
state the safety measures when carrying out earth fault loop impedance tests