priced a job a while back. also no earth to gas (being installed at the time), so priced for that too.
then gets a call a few days later 'can you take the earth price off job - plumber has done it when he installed the boiler
gets job, and finds this
:red card
mains is at the other side of the house
he also wired the boiler in 1mm flex from a JB on the ring main
then gets a call a few days later 'can you take the earth price off job - plumber has done it when he installed the boiler
gets job, and finds this
:red card
mains is at the other side of the house
he also wired the boiler in 1mm flex from a JB on the ring main