I've had this argument many times with a company i do work for, if the pipework isn't accessable then the bond goes to where it can be practically placed. They seem to think miracles can be carried out and get 10mm earth cables to places people can't reach!!or where is practical,BTW, its 600mm from the point of entry, 600mm from the meter is a gas reg
ThanksYes, but before any soldered bends etc. The incoming pipe isnt lead is it?AndyGuinness
Do you know the reg no. in the BRB?. I can't find this in the OSG.or where is practical,BTW, its 600mm from the point of entry, 600mm from the meter is a gas reg