Im on my second job for a builder........
Can i go and quote for utility room electrics and other stuff.
yep of i go...customer has a list of stuff she wants doing and i ask for a plan of the utility room and what she wants where,,,,not got one the builer is sorting it out.
When is this going ahead... Bank holiday monday not with me its not,,Tuesday start
Builder on site with plan...but a door going into the alleyway instead of into the house......stud wall is now full no door to the front of the garage,so no need for the 2way lighting i had discussed with her.
2 new lights were to be put in the lounge after the decorative beams had been removed and the ceiling replaced,,,,,nope the beams came down, ceiling is only to be skimmed now. What about my ffffing light routes ??
I said its going to be from above now shock on their faces.
can i also provide a fcu for a new wall mounted electric fire !!!
last but best the builder has arranged for all the other contractors,,plumber, plasterer to come on set days but never bothered to ask me if it fits in with me.
priced it up for 4 days including cu change
i have already put
Can i go and quote for utility room electrics and other stuff.
yep of i go...customer has a list of stuff she wants doing and i ask for a plan of the utility room and what she wants where,,,,not got one the builer is sorting it out.
When is this going ahead... Bank holiday monday not with me its not,,Tuesday start
Builder on site with plan...but a door going into the alleyway instead of into the house......stud wall is now full no door to the front of the garage,so no need for the 2way lighting i had discussed with her.
2 new lights were to be put in the lounge after the decorative beams had been removed and the ceiling replaced,,,,,nope the beams came down, ceiling is only to be skimmed now. What about my ffffing light routes ??
I said its going to be from above now shock on their faces.
can i also provide a fcu for a new wall mounted electric fire !!!
last but best the builder has arranged for all the other contractors,,plumber, plasterer to come on set days but never bothered to ask me if it fits in with me.
priced it up for 4 days including cu change
i have already put