Evening folks. I was wondering when you have a requirement to identify and label circuits inside a JB or CU for example. What would you typically use as labels.
I was thinking more about physically labeling the conductors to make circuit identification easier. Or it that something that's generally not done?If you look at the first sections on your EIC you will see all the columns that describe that circuit ieCable size
Overcurrent protection devise
max allowable Zs
r1+r2
rcd operating times
etc etc
This is what is normally left at the cu to identify all circuits.
I think this is what your asking
I have printed crackback labels for doing this and you can buy them from most scheme providers.
If you look at the first sections on your EIC you will see all the columns that describe that circuit ieCable size
Overcurrent protection devise
max allowable Zs
r1+r2
rcd operating times
etc etc
This is what is normally left at the cu to identify all circuits.
I think this is what your asking
I have printed crackback&sack labels for doing this and you can buy them from most scheme providers.
If you are talking about say some 10mm supplementary bonding wires in CU or at a MET by the CU, and you want to identify..Evening folks. I was wondering when you have a requirement to identify and label circuits inside a JB or CU for example. What would you typically use as labels.
the identification of conductors will be easy enough because they should follow the numbering of the various termination points...I was thinking more about physically labeling the conductors to make circuit identification easier. Or it that something that's generally not done?
I was been silly BlushingThanks for the replies. Still don't understand Apache's though :^O GH what products do you use when doing control panels etc.
I rather liked the rodent skin.I was been silly Blushing
oh you bad boy!!! X(I use my "Brother in law" as a printer.
You most probably have more cables to identify?All food for thought. I'm just used to labels. I work in the IT game and I'm used equipment and data cabling all being labelled.
Couldn't agree more.You almost always get a few options to consider with any enquiry on the forum... thanks to the broad wealth of experience we have in our members! :x :x