Just check this one over with me
House has been reposessed so all socket fronts switch fronts, downlights etc are missing
customer wants them putting back and a few alterations, i've added a few bits in for your help
Front Room
- Fit 4 wall lights at existing locations (lights not supplied)
- Connect 4 x Double Sockets
- Connect 2 x Single Sockets
- Connect 1 x Switch
Kitchen - already has 14 downlights in
- Install 6 x Brushed steel downlights - (in original locations)
- Wire and install 2 x Pendant lights - (inplace of other 8 downlights)
- Connect 2 x Switches
- Connect 3 x Double Sockets
- Connect 2 x Single Sockets
- Connect 1 x Fused Spur
- Make Safe cooker circuit - JB on the end for now
Master Bedroom
- Connect 2 x Single Sockets
- Connect 2 x Switches
- Wire and Install 2 x Extra Sockets - 2 new sockets on a blank wall
Hall -originally has 7 downlights
- Wire and Install 3 x Pendants
- Connect 4 x Switches
- Connect 3 x Chrome Downlighters - in original posistions
Dinning Room
- Wire and Install 2 x Pendants - (inplace of 6 downlights)
- Connect 2 x Switches
- Connect 2 x Double Sockets
- Connect 1 x Single Socket
Spare Room
- Connect 1 x Switch
- Connect 2 x Single Sockets
Guest Room
- Wire and Install 1 x Pendant -in place of 4 downlights
- Connect 1 x Switch
- Connect 1 x Double Socket
- Connect 1 x Single Socket
Bathroom
- Install supply for mirror light and shaver socket (mirror light not supplied)
- Wire and Install 2 x downlighters - in original posistions
- Wire and Install 1 x Pendant - in place of 4 downlights
Outside
- Check all outside lights operate correctly and safely.
- Change existing damaged light for standard bulkhead
Consumer Unit
- Install new 10way Dual RCD Consumer Unit
- Full Testing and Inspection of House
- Upgrade of Main Bonding - next to CU
As you can see theres a fair bit. Theres going to be a bit of jigging around of the lighting to convert from downlights to pendants etc, also its a bungalow with good loft access.
For me I come to 3days (540) and 270 for my parts with 10% with standard 280 on top for the CU and labour.
so thats 1090. Sounds a lot to me??
House has been reposessed so all socket fronts switch fronts, downlights etc are missing
customer wants them putting back and a few alterations, i've added a few bits in for your help
Front Room
- Fit 4 wall lights at existing locations (lights not supplied)
- Connect 4 x Double Sockets
- Connect 2 x Single Sockets
- Connect 1 x Switch
Kitchen - already has 14 downlights in
- Install 6 x Brushed steel downlights - (in original locations)
- Wire and install 2 x Pendant lights - (inplace of other 8 downlights)
- Connect 2 x Switches
- Connect 3 x Double Sockets
- Connect 2 x Single Sockets
- Connect 1 x Fused Spur
- Make Safe cooker circuit - JB on the end for now
Master Bedroom
- Connect 2 x Single Sockets
- Connect 2 x Switches
- Wire and Install 2 x Extra Sockets - 2 new sockets on a blank wall
Hall -originally has 7 downlights
- Wire and Install 3 x Pendants
- Connect 4 x Switches
- Connect 3 x Chrome Downlighters - in original posistions
Dinning Room
- Wire and Install 2 x Pendants - (inplace of 6 downlights)
- Connect 2 x Switches
- Connect 2 x Double Sockets
- Connect 1 x Single Socket
Spare Room
- Connect 1 x Switch
- Connect 2 x Single Sockets
Guest Room
- Wire and Install 1 x Pendant -in place of 4 downlights
- Connect 1 x Switch
- Connect 1 x Double Socket
- Connect 1 x Single Socket
Bathroom
- Install supply for mirror light and shaver socket (mirror light not supplied)
- Wire and Install 2 x downlighters - in original posistions
- Wire and Install 1 x Pendant - in place of 4 downlights
Outside
- Check all outside lights operate correctly and safely.
- Change existing damaged light for standard bulkhead
Consumer Unit
- Install new 10way Dual RCD Consumer Unit
- Full Testing and Inspection of House
- Upgrade of Main Bonding - next to CU
As you can see theres a fair bit. Theres going to be a bit of jigging around of the lighting to convert from downlights to pendants etc, also its a bungalow with good loft access.
For me I come to 3days (540) and 270 for my parts with 10% with standard 280 on top for the CU and labour.
so thats 1090. Sounds a lot to me??