dobo99
Member
- Joined
- Feb 18, 2008
- Messages
- 52
- Reaction score
- 0
Hi, been asked to tender for a hydroelectric project. As part of it have been asked to combine the 2 supplies coming back to the main switch room. 1 supply is from a 30Kw turbine 500m away and the other is a 90Kw turbine 50m away. Both supplies have to join to a 185mm swa that is already in the switch room.
Any ideas? I know what I'm thinking but wanted other ideas
Any ideas? I know what I'm thinking but wanted other ideas