My church has taken delivery of a 4.4kW commercial dish washer. They are assuming it can be powered from the ring final circuit in the kitchen or from the boiler circuit.
Am I correct in saying that this is "not on". Should it not be wired back to the Dist Board?
Am I correct in saying that this is "not on". Should it not be wired back to the Dist Board?