Hi, I visited a property today to price up a couple of extra sockets. When i opened the cu cupboard and inspected the head there was what looked like a DIY pme earth.
A few strands of the neutral (prior to the cutout) had been split off, wrapped in elec tape and sent to an earth block.
The homeowner said he knew nothing about it. There was a seperate switch fuse that supplied an old shower. looked about 15yrs old ish.
It looked like the previous spark/diyer had created this `PME` as there is no other earth.
As this is before the head surely this is the responsabillity of the DNO?? Would they sort for free or want to charge the usual
A few strands of the neutral (prior to the cutout) had been split off, wrapped in elec tape and sent to an earth block.
The homeowner said he knew nothing about it. There was a seperate switch fuse that supplied an old shower. looked about 15yrs old ish.
It looked like the previous spark/diyer had created this `PME` as there is no other earth.
As this is before the head surely this is the responsabillity of the DNO?? Would they sort for free or want to charge the usual