morning all,
i have a job on and its a tt, now the 16mm earth cable goes to the meter box outside and then down to the spike, but some idiot has use a connector block to join 4mm to the 16mm to make it long enough, can i put a earth block in to the meter box? i know its supposed to be unbroken but its a tudor black and white house and a right pig to get a new cable to the cu.
second question is, if puting a second cu outside next to the meter to supply out buildings do i need to run a earth from the first cu? or can i run a second straight from the rod?
thanks
i have a job on and its a tt, now the 16mm earth cable goes to the meter box outside and then down to the spike, but some idiot has use a connector block to join 4mm to the 16mm to make it long enough, can i put a earth block in to the meter box? i know its supposed to be unbroken but its a tudor black and white house and a right pig to get a new cable to the cu.
second question is, if puting a second cu outside next to the meter to supply out buildings do i need to run a earth from the first cu? or can i run a second straight from the rod?
thanks