Hi , can i ask a question, which may seem stupid.
I know gas , water and structure require bonding to a building but i always thought each service has to be bonded seperate to the earth bar.
Today i have come across a bond from the earth bar to the structure then to the gas pipe. I said to the man i work with ( he has been an electrician for years) that this is wrong and a seperate earth should be ran in for each service. He told me i was wrong and all services can be bonded together as in a radial.
Is he right? Tried to look in the regs book but doesn't really clarify anything.
I know gas , water and structure require bonding to a building but i always thought each service has to be bonded seperate to the earth bar.
Today i have come across a bond from the earth bar to the structure then to the gas pipe. I said to the man i work with ( he has been an electrician for years) that this is wrong and a seperate earth should be ran in for each service. He told me i was wrong and all services can be bonded together as in a radial.
Is he right? Tried to look in the regs book but doesn't really clarify anything.