I went to look at a job on behalf of a friend today and the work has not been fully completed. The following work is still to be done;
1. Cannot see main protective bonding conductor to gas incoming pipe.
2. One pair of under cabinet lights to be connected (T&E cable cut too short).
3. One single under cabinet light to be connected.
4. Two loose CPC's need connecting in CCU.
5. CPC's in socket(s) to be connected.
6. TV Aeriel junction boxes to be installed and connected to 3 other rooms.
7. testing of full installation.
The owner tells me he had an electrician in to re-wire the flat and has gone on the missing list. I have mentioned about Notifying work and really the previous electrician should have done this and there is no paperwork. So if there is a competent electrician willing to take over the job, can they contact me and I shall furnish with pictures and contact details. The owner is elderly with disabilities and has been messed about and just wants the job finished.
Thanks
1. Cannot see main protective bonding conductor to gas incoming pipe.
2. One pair of under cabinet lights to be connected (T&E cable cut too short).
3. One single under cabinet light to be connected.
4. Two loose CPC's need connecting in CCU.
5. CPC's in socket(s) to be connected.
6. TV Aeriel junction boxes to be installed and connected to 3 other rooms.
7. testing of full installation.
The owner tells me he had an electrician in to re-wire the flat and has gone on the missing list. I have mentioned about Notifying work and really the previous electrician should have done this and there is no paperwork. So if there is a competent electrician willing to take over the job, can they contact me and I shall furnish with pictures and contact details. The owner is elderly with disabilities and has been messed about and just wants the job finished.