Not been on here for a while been very busy, hope every1 is ok.
Got a couple of easy questions im unsure about,
half way through a mains change empty property
end to end on kitchen ring, L/L .45
N/N .16
normally i would try and find the fault and fix but every socket in the kitchen cannot be taken off as when tiled they have tiled the sockets in and there is no way of getting them off, is it my responsibility to fix this problem or should i just note on the cert?
There is also a boiler in the bathroom fed from a fcu, the fcu is roughly 1 m from edge of bath and under half a meter from sink, is it ok to leave as is or does it require to be ip rated?
thanks
Got a couple of easy questions im unsure about,
half way through a mains change empty property
end to end on kitchen ring, L/L .45
N/N .16
normally i would try and find the fault and fix but every socket in the kitchen cannot be taken off as when tiled they have tiled the sockets in and there is no way of getting them off, is it my responsibility to fix this problem or should i just note on the cert?
There is also a boiler in the bathroom fed from a fcu, the fcu is roughly 1 m from edge of bath and under half a meter from sink, is it ok to leave as is or does it require to be ip rated?
thanks