Hi guys,
I was talking to an electrician recently and we got chatting about consumer unit changes (I'm training currently so thought I'd pick his brains), and he mentioned something that I was unsure about.
He said after you do a CU change, you HAVE to do a full condition report of the entire installation (he apparently does some basic testing before to check there are no hidden suprises).
I haven't seen anything about doing a full EICR after a board change, I get doing some basic tests to confirm the work you have completed, but not for the rest of the installation.
Thanks for any answers.
I was talking to an electrician recently and we got chatting about consumer unit changes (I'm training currently so thought I'd pick his brains), and he mentioned something that I was unsure about.
He said after you do a CU change, you HAVE to do a full condition report of the entire installation (he apparently does some basic testing before to check there are no hidden suprises).
I haven't seen anything about doing a full EICR after a board change, I get doing some basic tests to confirm the work you have completed, but not for the rest of the installation.
Thanks for any answers.