moose man
Senior Member
- Joined
- Aug 8, 2009
- Messages
- 510
- Reaction score
- 0
on a industrial scale if a if the custormer supplied a spure unit for a heater would you use a minor works from the spure upto the heat as addition to exsisting circuit and how would you get on with the controls for the heater would this need certing as well
and with a 2392 would you be able to issue certs for this type of installation
thanks moose man
and with a 2392 would you be able to issue certs for this type of installation
thanks moose man