Hi all need a bit of help with a remidial from one of my PIR's.
Its from a PIR at a carehome.
One of the defects is the supply from the cutout to the main DB.
TT system, split phase. The main DB is about 10metres away from the cutout, which is in a meter box on an o/s wall. The supply is run as three seperate 25mm singles (L1,L2,N) up a wall void and then above a kitchen ceiling. The earth rod is about 2 foot away from the meter box then runs up the wall and across kitchen ceiling to DB, not entering meter box.
Tis all a bit of a mess, all 3 cables look real tatty, like someones had a hard time dragging them through the wall. Theres no fused isolator, no RCD protecting the meter tails.
I intend to replace this supply with a 3 core swa, fed from a 100mA time delayed RCD and isolation within the meter box.
Whats anyones thoughts on this?
Im not entirely sure on best way to acheive everything, DNO required isolater for length of tails, RCD for cable to meet disconnection times etc etc. Room is tight within the meter box.
to top it all off, its not technically a split phase. everything installed is as a split phase supply (main DB, warning signs etc). But after the cutout one of the phases is disconnected (fuse still in) and a single phase meter installed onto L1, then into a henley block, splitting into two 25mm2 cables (marked L1 & L2). This makes me think a meter change may have been done in the past few years, the person changing it only putting it onto one phase. I intend to speak to the DNO about it tommorow as its a bit too much load for single phase, its a 40 room carehome with kitchen, laundry etc.
Anyones views would be much appreciated, apologies if its drabble is quite alot of details to try and cram in.
Cheers
Its from a PIR at a carehome.
One of the defects is the supply from the cutout to the main DB.
TT system, split phase. The main DB is about 10metres away from the cutout, which is in a meter box on an o/s wall. The supply is run as three seperate 25mm singles (L1,L2,N) up a wall void and then above a kitchen ceiling. The earth rod is about 2 foot away from the meter box then runs up the wall and across kitchen ceiling to DB, not entering meter box.
Tis all a bit of a mess, all 3 cables look real tatty, like someones had a hard time dragging them through the wall. Theres no fused isolator, no RCD protecting the meter tails.
I intend to replace this supply with a 3 core swa, fed from a 100mA time delayed RCD and isolation within the meter box.
Whats anyones thoughts on this?
Im not entirely sure on best way to acheive everything, DNO required isolater for length of tails, RCD for cable to meet disconnection times etc etc. Room is tight within the meter box.
to top it all off, its not technically a split phase. everything installed is as a split phase supply (main DB, warning signs etc). But after the cutout one of the phases is disconnected (fuse still in) and a single phase meter installed onto L1, then into a henley block, splitting into two 25mm2 cables (marked L1 & L2). This makes me think a meter change may have been done in the past few years, the person changing it only putting it onto one phase. I intend to speak to the DNO about it tommorow as its a bit too much load for single phase, its a 40 room carehome with kitchen, laundry etc.
Anyones views would be much appreciated, apologies if its drabble is quite alot of details to try and cram in.
Cheers