I'm just curious.... :coat
Local job, consists of three parts:
1. Replace an existing faulty 2 gang dimmer
2. Install a new double socket on the same stud wall as an existing double (so basically up the stud wall, 8 feet along in the loft and drop down. socket to be sunk - drylined box. Only issue might be noggins!
3. Install new aerial socket next to new double socket - easy access in the loft to existing aerial cable that can be "tapped" into - dryline box sunk in - again only issue might be noggins!
New house (about 7 years old, all bonding, earth and RCD ok)
How long and how much (inc materials)? ?:|
O.
Local job, consists of three parts:
1. Replace an existing faulty 2 gang dimmer
2. Install a new double socket on the same stud wall as an existing double (so basically up the stud wall, 8 feet along in the loft and drop down. socket to be sunk - drylined box. Only issue might be noggins!
3. Install new aerial socket next to new double socket - easy access in the loft to existing aerial cable that can be "tapped" into - dryline box sunk in - again only issue might be noggins!
New house (about 7 years old, all bonding, earth and RCD ok)
How long and how much (inc materials)? ?:|
O.