hi all
when you upgrade a c/u, you inspect and test the whole installation as you do.
where does it state that you have to update the installation i.e say there is no sleeving on some earth conducters at light switchs or green only sleeving not green yellow, the switch live not sleeved red or brown:|
i've just been given a lad on work experience starting his second year and his last trainer was sorting all the above.
i thought as long as you made a note on the perodic eic that was ok as your only changing the board. code 1's you do have to put right i know.
any of you gone this far when changing c/u
when you upgrade a c/u, you inspect and test the whole installation as you do.
where does it state that you have to update the installation i.e say there is no sleeving on some earth conducters at light switchs or green only sleeving not green yellow, the switch live not sleeved red or brown:|
i've just been given a lad on work experience starting his second year and his last trainer was sorting all the above.
i thought as long as you made a note on the perodic eic that was ok as your only changing the board. code 1's you do have to put right i know.
any of you gone this far when changing c/u