Hi all. Starting out on my own and was just interested in what sort of quotes you guys would put in for these two jobs. First is removing three ceiling roses and fitting a new fitting about a metre and a half away. Its in a restaurant so floor above is used too. Has exposed floorboards as finished floor do I'm going to pull some up to co next up new length of cable for new fitting. Do a minor works cert test as applicable and job done (in an ideal world) second job is fitting 3 external security lights to a house and in garage fit 2 push stop isolators fir a lathe and milling machine. Also with regards to the last one, the has a garbage CU already in place, should i replace b type to c type mcb and could i then use the existing ring to feed the lathe switches going via FCU or have these switches got to be on their own dedicated circuit? Customer also told me how the set up is at the moment when lathe switched on the lights flicker, any ideas on that would be really helpful. Thanks in advance to everyone
jay
jay