Oh boy where do I start....No pictures yet but here is a little insight.
Currently this builders yard has a sp TT supply into one store building old 3036's not an rcd in sight, bog standard sockets & metal back boxes (not metal clad) surface mounted no grommets with T/E clipped down walls.
This cu feeds a second cu in the office that does more pvc surface mounted sockets & internal lighting.
cu 1 also does all the outside lighting.. all the floods are wired in T/E that is hung through conifer hedge around the yard, been there so long the trees have grown around & enclosed the T/E in places.
It also has a 2.5mm submain in T/E, hung through the trees to an old broke down luton van, i here there is a metal clad 3036 cu hanging on a length of bailing twine feeding a couple of sockets & a light.
So I have to quote for new cu's / submains / rewire stores & ofice + new submains to an external cu for flood lighting & 2x submains to another two sheds that require cu's & circuits, another submain to a caravan hook up for shipping container hook up in the future. Sort out all the flood lighting
Need the supply cable extending/replacing from pole for relocation of metering & cu 1...............must remember to call dno in the morning.
Pictures will follow in the future.........................................if my quote is accepted.
Currently this builders yard has a sp TT supply into one store building old 3036's not an rcd in sight, bog standard sockets & metal back boxes (not metal clad) surface mounted no grommets with T/E clipped down walls.
This cu feeds a second cu in the office that does more pvc surface mounted sockets & internal lighting.
cu 1 also does all the outside lighting.. all the floods are wired in T/E that is hung through conifer hedge around the yard, been there so long the trees have grown around & enclosed the T/E in places.
It also has a 2.5mm submain in T/E, hung through the trees to an old broke down luton van, i here there is a metal clad 3036 cu hanging on a length of bailing twine feeding a couple of sockets & a light.
So I have to quote for new cu's / submains / rewire stores & ofice + new submains to an external cu for flood lighting & 2x submains to another two sheds that require cu's & circuits, another submain to a caravan hook up for shipping container hook up in the future. Sort out all the flood lighting
Need the supply cable extending/replacing from pole for relocation of metering & cu 1...............must remember to call dno in the morning.
Pictures will follow in the future.........................................if my quote is accepted.