perhaps,DP RCD'S are required on certain special installations IE caravan parks and jetty's they are made for the job. But as said I am unaware of a reg saying DP RCD protection is required on all TT installations. The regs do say that you do need to isolated all poles and phases and neutral on three phase though maybe this is were the confusion comes in.
:|
I no longer know anything.
:Blushing