Just been doing an EICR on a converted mill. The property has 3 small stairwells serving the various flats. Now the main supply is to 1 stairwell, in a little cupboard under the stairs, then submained to the other 2 stiarwells. In these stairwells the Cu is behind a very nicely fireproofed wooden panel which is held by 4 screws, so basically can only be accessed with tools, and therefore not easily accessible. To my mind these panels should be hinged and CU accessible without use of a screwdriver. Am I being overzealous?????