Good evening all, Can anyone offer any advice as to how i should tackle this slight problem i have. I have to upgrade my main protective bonding conductor to my water pipe (to 10mm), as i will be doing a CU change in the next few days. My current bonding is 6mm and the meter tails are 16mm to my current CU. I can't access the pipe behind the stop cock to get my 10mm and earth tag around it. Its protruding through a stud partision wall with a metal plate around it. Going by BS7671 section 544.1.2 I have to make a connection to the water pipe as near as practicable to the point of entry of that service. And be within 600mm of the meter outlet union if the meter is external. I know that the pipes branch off behind the stud wall because there are two water pipes coming out to the left of the wall, and going to the sink. The regs state that a connection should be made before any branch pipework. Is there a solution to this because i don't really want to start pulling the stud wall down. All replies will be appreciated, thanks.