Hello all,
Doing thre cert for a shower install, but I have a question with the max demand. The tails split at the meter and it has 2 seperate fuse boxes, one for the flat and one for the economy 7, so for the max demand should I include the E7 board or not?
Thanks
Doing thre cert for a shower install, but I have a question with the max demand. The tails split at the meter and it has 2 seperate fuse boxes, one for the flat and one for the economy 7, so for the max demand should I include the E7 board or not?