Morning everyone. Job this week to install supply to charge a milk float which has been converted to an 8 seater tram (for the purpose of guided tours). Previously the float was kept at the owners house and the charger supply was installed by another company (British Gas). As it was a domestic property it was treated as an electric vehicle supply and utilised TT earthing.
The float is now going to be stored on a farm in 1 of the sheds. Supply to the farm is 3 phase TNC-S.
Do I need to treat the same as before and bang a rod/rods in and treat as TT?
Many thanks