Well Friday was a bad day we had installed a builders supply, 2 way Rcd Board, couple of twin sockets, all inside builders provided meter type box, this was mounted adjacent to the Western Power meter box.
Our earth rod was directly below, about 1.5M away, all done nicely with conduit etc.
So Npower turn up to fit the meter and stick the fuse in, "Sorry mate I cannot connect that"
Why I ask.
"Because the earth rod needs to be 9M from the meter"
Why I ask.
"Don't know he replies, but unless you move it I ain't connecting"
Well ring your boss and explain that the ground is being removed all around and they will dig the rod up.
"Don't matter my boss will just agree with what I've told you and you will have to move it or no connect"
Problem - I did not have a spare rod and could not get that one out, so got my 1M - 18mm SDS drill bit out the van stuck it in the drill and fired it into the ground, replaced cable and clamped earth to my drill bit, tested 166 ohms, not bad for a drill bit haha.
Anyway he then connected while I had a tidy up with me moaning every time I walked past him.
Well he said thanks and got in his van a drove off.
I sat in my van brooding why should I have moved it, called builder to say job done and explained what had gone on, he said we are digging all that ground out on Monday, so I thought sod it got out of van and put it back how I had it to start with, after all it is my earth and not NPowers.
So can anyone throw some light on why NPower insist on 9M, yet Western Power and SSE don't, it's mind boggling.
I am in the village again later this week so can move it to the 9M zone once they have removed ground, but until someone can convince me, its staying.
Our earth rod was directly below, about 1.5M away, all done nicely with conduit etc.
So Npower turn up to fit the meter and stick the fuse in, "Sorry mate I cannot connect that"
Why I ask.
"Because the earth rod needs to be 9M from the meter"
Why I ask.
"Don't know he replies, but unless you move it I ain't connecting"
Well ring your boss and explain that the ground is being removed all around and they will dig the rod up.
"Don't matter my boss will just agree with what I've told you and you will have to move it or no connect"
Problem - I did not have a spare rod and could not get that one out, so got my 1M - 18mm SDS drill bit out the van stuck it in the drill and fired it into the ground, replaced cable and clamped earth to my drill bit, tested 166 ohms, not bad for a drill bit haha.
Anyway he then connected while I had a tidy up with me moaning every time I walked past him.
Well he said thanks and got in his van a drove off.
I sat in my van brooding why should I have moved it, called builder to say job done and explained what had gone on, he said we are digging all that ground out on Monday, so I thought sod it got out of van and put it back how I had it to start with, after all it is my earth and not NPowers.
So can anyone throw some light on why NPower insist on 9M, yet Western Power and SSE don't, it's mind boggling.
I am in the village again later this week so can move it to the 9M zone once they have removed ground, but until someone can convince me, its staying.