Thanks in advance for any advice given on this. The house has traditionally had two sets of sockets (one for mains power and the other for off-peak, currently E10) feeding to two separate meters.
I'm thinking of switching to a new tariff that doesn't differentiate on timing and has one meter but ideally don't want to lose the ability to use the current off-peak / E10 sockets. Is there a way that both current circuits can be fed from one power source and charged through one meter? Or is it unlikely that this will be possible and the off-peak E10 sockets will end up without power?
I'm thinking of switching to a new tariff that doesn't differentiate on timing and has one meter but ideally don't want to lose the ability to use the current off-peak / E10 sockets. Is there a way that both current circuits can be fed from one power source and charged through one meter? Or is it unlikely that this will be possible and the off-peak E10 sockets will end up without power?